Project

General

Profile

Actions

Client Requirement (CRQ) #207

open

Verify OT exceeding the maximum limit is converted into Allowance.

Added by Raja MK about 1 month ago. Updated 9 days ago.

Status:
Ready to test
Priority:
High
Assignee:
Category:
-
Start date:
07/03/2026
Due date:
% Done:

0%

Estimated time:
Platform:
Web

Description

Field Details
Test Case ID TC_CR_009
Test Case Verify OT exceeding the maximum limit is converted into Allowance.
Module E-TMS
Category Client Requirement
Priority High
Preconditions Maximum OT limit is configured.
Test Steps 1. Record OT exceeding the limit.
2. Process payroll.
3. Verify Allowance.
Expected Result Excess OT is automatically converted into an allowance.
Actions

Also available in: Atom PDF